Every action on every inspection record needed to be included in a real time report, enabling a full audit trail to be viewed or exported at any stage, providing full digital progressive assurance of every inspection or repair, and across every digital file held in the solution.
All eviFile’s data storage is also heavily encrypted and is only accessible through the platform ensuring that all reports were tamper free and fit for distribution to Drax’s insurers.
All of the data needed to be reported in real time, so a number of custom reports displaying the exact status of every inspection were configured and the data from these reports was available on platform or through an export/API call for inclusion in other solutions such as Power BI or Tableau.
This provided a robust mechanism to move data into the platform and to also make it available for any wider reporting needs.
The end to end NDT testing process is highly complex, with many different tiers of management, sub-contractors and insurers being involved at various stages of the outage process. As part of the professional services layer we provide with eviFile, we have reviewed the existing process to ensure they are as “lean” as possible before we digitise them.
We understand that moving from a primarily paper-based environment means that processes can be stripped back to ensure they are as efficient as possible when we move them to be managed in eviFile.s – which could take months using traditional methods. Our digital evidence can’t be tampered with which also helps utility companies, contractors and regulators all avoid costly legal disputes.”
Commenting on the technology, head of construction services at United Utilities, William Eyre, added: “We’re very driven to improve the visibility of the health of our projects – and eviFile is the tool to do it. We now have a much more efficient, accurate and secure way of reporting on progress of construction against our delivery schedule and on key issues like environment, quality and health and safety.
“Introducing this technology has brought benefits across the whole project supply chain, for contractors, field operatives, project managers, stakeholders and regulators. Despite the challenges posed by Covid, we expect the project to be completed on time, in 2022.”
Once complete, the 100km pipeline will link West Cumbria’s Thirlmere reservoir with the rest of the region’s water network, to bring a more reliable and sustainable supply to West Cumbria by 2022.
eviFile’s growing presence in the marketplace – as an agile digitised workflow solution – is already having a positive impact on overhead projects in rail, critical infrastructure pipelines, and non-destructive testing in the power sector. Clients include major contractors and service providers such as VolkerRail, Network Rail, SPL, United Utilities, and Drax.